Our Firm

 

 
 
Photo courtesy of Clotfelter-Samokar
 

Warren County Technology Center - Bowling Green, Kentucky

 

Project Data

Owner: South Central Kentucky Regional Develpment Authority
Architect: Clotfelter-Samokar
Location: Bowling Green, Kentucky
Building Area: 33,000 s.f.

 

Project Description

 

  • Robotic Welding Labs
  • Large General Pupose Lab
  • CNC Tool Shop
  • 4 Small, Versatile Labs
  • 4 Classrooms, able to open into one large area
  • 2 Computer Labs
  • Office Suite
  • Board Room/ Conference Room
  • Geothermal HVAC System

Comments

Geotech Engineering & Testing, Inc. provided the complete structural engineering design services for this one-story steel moment frame training facility located in Bowling Green, Kentucky.

This state-of-the-art facility features high bay robotic labs, classroom/teaching spaces, and common areas for student interaction among many other modern amenities. This facility will eventually be used as a training facility for the future industrial sites located in the surrounding area, and also as classroom space for the Kentucky Community and Technical College System (KCTCS).

Structural elements in the design included translucent curtain walls, curved roofs and a tapered and sloped “sawtooth” storefront.